

02 Splashlandings, Alton Towers |
||
|---|---|---|
| Feature Details | A water park with 1000m2 of water, indoor pools, outdoor pools, flumes, Master Blaster, childrens tower, river, tipping bucket and many other features. | |
| Client | Madame Tussauds | |
| Completion | 2003 | |
| Construction Cost | £12,000,000 | |
| Our Role | Design reviews of the water treatment and water feature systems; site monitoring of installation and commissioning. | |
Design Team |
||
| Architect | Shepherd Design | |
| Aquatic Consultant | Devin | |
| M & E Engineers | Shepherd Design | |
![]() |
![]() |
