right_graphic
water engineering
 
01 Sportslink Pool, Dublin
line
  Feature Details A swimming complex with a 25m pool and a leisure pool with flumes, waves, lazy river, kiddies pool, air geysers and bubble pool.
Client Sportslink
Completion 2004
Construction Cost €10,000,000
Our Role Water treatment on all pools, movable floor and all water features.
Design Team
 
line
  Architect Burke Kennedy Doyle
Aquatic Consultant Devin
Structural Engineers Muir
M & E Engineers McCarrick Woods
Quantity Surveyors David Turner Associates

graph
puretechnology
kyoung@devin.be+44 (0)191 258 1653