water engineering
 
03 Dubai Aquatic Centre
line
  Pool Details The 50m x 25m and diving pools are being built for the 10th FINA World Championships 2010. There will also be a 50m x 21m multipurpose pool incorporating 2 submersible booms and 1 movable floor with the facility to incorporate full diving facilities.
Client Dubai Municipality
Completion 2009
Construction Cost £100,000,000
Our Role Water treatment on all pools, movable floor and submersible booms and diving pool air cushion systems.
Design Team
 
line
  Architect FaulknerBrowns
Aquatic Consultant Devin
Structural Engineers Arup
M & E Engineers Arup
Quantity Surveyors Davis Langdon

graph
puretechnology
kyoung@devin.be+44 (0)191 258 1653